Got the rehearsal hall ready for the first rehearsal by what I call taping the floor down. That is basically taping down a huge blueprint on the floor and setting chairs for the furniture for the actors to rehearse on. I will be going over to the rehearsal hall today to go over the ground plan and mock setup with the director and see if all issues are ironed out. Once this is done I can begin on the plans for the carpenter and then it will be time to pick the amazing period sofa that will be used in the play.
0 Comments
Leave a Reply. |
My blog is all about the design process, set design,designers I love and architecture. Take a look behind the curtain!
Recommended
|